EL Haynes PCS – Topping Out

Posted on April 16th, 2012 in Blog, Charter Schools, Green, Green Architecture
Friday was a big day at the EL Haynes PCS – Kansas Avenue campus. The construction crew finished building the steel frame of the building, and it is now at its tallest. To celebrate, the team held a ‘topping out’ party. People from the school, teachers, the construction company, and the architectural team were on site to watch the school’s top performing students sign the last piece of steel, before it was lifted and installed in place.  
 
     
   
  
 
   
   
 
 
Tags: , , , ,

Leave a Reply